Home / New Zealand guides / Load planning / Essential load inventory: Compact apartment

Essential load inventory for a compact apartment in New Zealand

New Zealand planning guidance for a specific property and load boundary. Separate apartment circuits from building-wide demand. H2OME remains in early development.

Essential load inventory: the decision to make

Start with tasks, not every socket. Food storage, drinking water, communication and safe movement are separate needs, each with an appliance, an operating window and an alternative. Record rated watts as a first pass, then measure representative use because a nameplate may describe a maximum rather than an average.

A list is only useful if somebody can explain why each item remains on it. An appliance that feels convenient during normal operation may consume the reserve intended for a more important task. Keep essential, deferrable and excluded loads in separate columns.

Priorities for compact apartment

Cooking appliances, tumble drying and communal services are outside this illustrative essential load set.

The property boundary

Shared walls, common switchboards and building rules matter as much as the demand inside the flat. A resident does not control the lift, communal pump or fire systems simply because they can list their own appliances.

For a compact apartment, start by confirming why refrigerator, assumed time-averaged input belongs on the essential list. Then challenge whether an extra task lamp not included in the base list belongs in the list: its 0.06 kWh should be included only when it serves an agreed task, not because it happened to be plugged in.

Separate apartment circuits from building-wide demand. An apartment may be unsuitable for on-site hydrogen equipment. Do not infer suitability from low electricity demand; building permissions, safe separation and professional assessment come first.

A worked demand worksheet

All numbers below are hypothetical teaching inputs, not measured appliance specifications or product performance. The topic-specific extra load is separate from the base set; omit it if your real inventory already counts it. This worksheet does not include conversion overhead, protection design or a contingency allowance.

For a compact apartment, assume the selected base loads average 0.13 kW for 6 hours: 0.13 × 6 = 0.78 kWh. Separately, an extra task lamp not included in the base list draws an assumed 12 W for 5 hours: (12 ÷ 1,000) × 5 = 0.06 kWh. The combined illustrative demand is 0.84 kWh.

Small additions are easy to overlook when several people each add one device.

For arithmetic only, if the complete storage chain had a hypothetical 30% round-trip efficiency, delivering 0.84 kWh would require 0.84 ÷ 0.30 = 2.8 kWh of charging input. This is not a measured H2OME efficiency or recovery result. Ongoing demand during charging would add to the required input.

Base assumptions

Base operating window: 6 hours. Extra illustrative load: An extra task lamp not included in the base list, 12 W for 5 hours. Replace every input with a measured or professionally established value.

Topic checks

Property checks

Professional review in New Zealand

In New Zealand, discuss supply arrangements and connection questions with your electricity retailer and distributor. Ask the local council about relevant siting, building and water-use requirements. Use appropriately qualified electrical and hydrogen professionals, and refer workplace safety questions to WorkSafe guidance. This page does not establish a consent or compliance outcome.

For medically dependent people in New Zealand, register with your electricity retailer, the company that bills you, and keep that registration current. Re-register when switching retailers; ask the retailer how the distributor is informed and what clinical confirmation is needed. Follow the clinician and equipment provider's contingency plan. Registration does not guarantee uninterrupted electricity, and H2OME is not a substitute for that plan.

H2OME is in early development. Its 10 kW output figure is a design target, not a proven specification. There is no confirmed price, certification, commercial availability or guaranteed runtime in this guide.

Hydrogen is an energy store, not free energy. Grid input, wind and micro-hydro are the charging options considered here. Each requires its own supply assessment. Do not install hydrogen equipment, modify fixed wiring, bypass protection or improvise a connection from this guide.

Background sources

These official resources provide energy, consumer and technical background. They are not endorsements of H2OME, proof of its performance or a substitute for site-specific professional advice.

Questions

What changes for a compact apartment?

Shared walls, common switchboards and building rules matter as much as the demand inside the flat. A resident does not control the lift, communal pump or fire systems simply because they can list their own appliances. Separate apartment circuits from building-wide demand.

Does this calculation show how long H2OME would run a compact apartment?

No. The 0.84 kWh total is an illustrative demand worksheet, not a runtime result. Actual appliance measurements, usable storage output, starting demand, conversion overhead and reserve limits are needed. The 10 kW design target is not demonstrated output capability.

Who should review the proposal?

In New Zealand, discuss supply arrangements and connection questions with your electricity retailer and distributor. Ask the local council about relevant siting, building and water-use requirements. Use appropriately qualified electrical and hydrogen professionals, and refer workplace safety questions to WorkSafe guidance. This page does not establish a consent or compliance outcome. Use the worksheet to brief the relevant professionals, not to install, modify or operate hydrogen equipment.

Continue the assessment

Contact us

Ask us about H2OME, tell us about your property or register your interest in the proposed system. We are in early development. No payment or purchase commitment; contacting us does not guarantee a pilot installation.