Home / New Zealand guides / Load planning / Appliance duty cycles: Compact apartment
New Zealand planning guidance for a specific property and load boundary. Separate apartment circuits from building-wide demand. H2OME remains in early development.
A thermostat-controlled load switches between operating states. Multiplying its maximum input by every hour can exaggerate consumption, while measuring only a quiet interval can understate it. Log a complete representative operating cycle and note ambient conditions, door openings, water use or other factors that change the cycle.
Time-averaged power is appropriate for an energy worksheet but not for protection or peak output checks. Keep the active-state input and measured operating fraction visible. A changed use pattern during an outage can make yesterday's duty-cycle average irrelevant.
Cooking appliances, tumble drying and communal services are outside this illustrative essential load set.
Shared walls, common switchboards and building rules matter as much as the demand inside the flat. A resident does not control the lift, communal pump or fire systems simply because they can list their own appliances.
Review how refrigerator, assumed time-averaged input was averaged for a compact apartment. If occupants change the operating routine during the 6-hour base window, replace the base average rather than retaining it and merely adding the extra appliance.
Separate apartment circuits from building-wide demand. An apartment may be unsuitable for on-site hydrogen equipment. Do not infer suitability from low electricity demand; building permissions, safe separation and professional assessment come first.
All numbers below are hypothetical teaching inputs, not measured appliance specifications or product performance. The topic-specific extra load is separate from the base set; omit it if your real inventory already counts it. This worksheet does not include conversion overhead, protection design or a contingency allowance.
For a compact apartment, assume the selected base loads average 0.13 kW for 6 hours: 0.13 × 6 = 0.78 kWh. Separately, an extra controlled appliance averaged to 100 w draws an assumed 100 W for 10 hours: (100 ÷ 1,000) × 10 = 1 kWh. The combined illustrative demand is 1.78 kWh.
The assumed average must be supported by measurements; its active-state demand could be higher.
For arithmetic only, if the complete storage chain had a hypothetical 30% round-trip efficiency, delivering 1.78 kWh would require 1.78 ÷ 0.30 = 5.9333 kWh of charging input. This is not a measured H2OME efficiency or recovery result. Ongoing demand during charging would add to the required input.
Base operating window: 6 hours. Extra illustrative load: An extra controlled appliance averaged to 100 W, 100 W for 10 hours. Replace every input with a measured or professionally established value.
In New Zealand, discuss supply arrangements and connection questions with your electricity retailer and distributor. Ask the local council about relevant siting, building and water-use requirements. Use appropriately qualified electrical and hydrogen professionals, and refer workplace safety questions to WorkSafe guidance. This page does not establish a consent or compliance outcome.
For medically dependent people in New Zealand, register with your electricity retailer, the company that bills you, and keep that registration current. Re-register when switching retailers; ask the retailer how the distributor is informed and what clinical confirmation is needed. Follow the clinician and equipment provider's contingency plan. Registration does not guarantee uninterrupted electricity, and H2OME is not a substitute for that plan.
H2OME is in early development. Its 10 kW output figure is a design target, not a proven specification. There is no confirmed price, certification, commercial availability or guaranteed runtime in this guide.
Hydrogen is an energy store, not free energy. Grid input, wind and micro-hydro are the charging options considered here. Each requires its own supply assessment. Do not install hydrogen equipment, modify fixed wiring, bypass protection or improvise a connection from this guide.
These official resources provide energy, consumer and technical background. They are not endorsements of H2OME, proof of its performance or a substitute for site-specific professional advice.
Shared walls, common switchboards and building rules matter as much as the demand inside the flat. A resident does not control the lift, communal pump or fire systems simply because they can list their own appliances. Separate apartment circuits from building-wide demand.
No. The 1.78 kWh total is an illustrative demand worksheet, not a runtime result. Actual appliance measurements, usable storage output, starting demand, conversion overhead and reserve limits are needed. The 10 kW design target is not demonstrated output capability.
In New Zealand, discuss supply arrangements and connection questions with your electricity retailer and distributor. Ask the local council about relevant siting, building and water-use requirements. Use appropriately qualified electrical and hydrogen professionals, and refer workplace safety questions to WorkSafe guidance. This page does not establish a consent or compliance outcome. Use the worksheet to brief the relevant professionals, not to install, modify or operate hydrogen equipment.
Ask us about H2OME, tell us about your property or register your interest in the proposed system. We are in early development. No payment or purchase commitment; contacting us does not guarantee a pilot installation.