Home / Uses / Council consent questions for hydrogen storage

Council consent: the questions to ask before you install

A home hydrogen system touches building, electrical and hazardous substances rules. Asking the right questions early saves months of back and forth later.

Building and siting

Start with the basics your council will ask about. Does the enclosure or its foundation need building consent? What setbacks apply from boundaries, the house, other buildings and any driveway? Are there district plan rules about structures in your zone, especially on rural lifestyle blocks or in coastal and flood hazard areas? Bring a site plan showing where the enclosure would sit, the vent outlet and the cable run to the switchboard.

What it would keep running

  • Site plan with enclosure and vent outlet
  • Cable route to the switchboard
  • Wind turbine height and noise details
  • Micro-hydro water take information
  • Design standards documentation

Hazardous substances and gas

Hydrogen is a flammable gas, so rules about storing hazardous substances may apply depending on quantity, location and jurisdiction. In New Zealand and in each Australian state, those rules sit with different regulators, and councils will often point you to them. Ask whether the stored quantity triggers any certification, signage or separation requirement, and whether fire services need to be told.

It also helps to ask whether the council has dealt with hydrogen storage before. If it has not, expect more questions, and expect the pilot team to help supply the technical detail on how the system is designed to AS/NZS 60079 and ISO 19880.

How it works →
The H2OME loop: an electrolyser splits water into hydrogen, the hydrogen is stored in a tank for weeks, a fuel cell turns it into electricity for your home, and the water returns to the loop.

Electrical and wind or hydro

The electrical connection must be done and certified by a registered or licensed electrician, and your lines company may need to know about a new inverter connected to its network. If you plan to charge from a wind turbine, ask about height limits, noise rules and setbacks for turbines. A micro-hydro scheme raises water take questions with your regional council. Settle these early, because they can take longer than the install.

Questions

Will I definitely need a building consent?

We cannot say for every site. It depends on the enclosure, the foundation, your district plan and how your council classifies the work. Ask the council directly with a site plan in hand. The pilot team will supply technical information to support any application.

Is the system certified?

It is designed to AS/NZS 60079 and ISO 19880. We say designed to, not certified, because it is still in development. Any certification needed for a specific install would be worked through with the relevant authorities during the pilot.

Do I need to tell the fire service?

Ask your council and the relevant hazardous substances regulator whether notification is required for your stored quantity. Even where it is not required, letting local fire crews know there is hydrogen storage on site is good practice for any rural property.