Home / Locations / Western Australia / Malebelling

Off-grid and backup power in Malebelling

Malebelling 6302, Western Australia. Long-outage backup for homes and farms at the end of the line, and a step towards cutting the cord.

Power in Malebelling

Malebelling is classed as outer regional. Properties out here often sit at the end of long single lines through open country, where one fallen tree can take out a whole road and crews can be hours away.

  • Farms with water pumps and cool rooms
  • Homes at the end of long rural lines
  • Workshops and sheds away from the house
Locality
Malebelling, WA 6302
Council area
Beverley
Remoteness
Outer regional (ABS)
Nearest centre
83 km from Perth

Water in. Power out.

Cheap power splits water into hydrogen. The hydrogen waits in a tank. When the lines go down in Malebelling, a fuel cell turns it back into electricity and water, and the water goes round again.

How it works →

Malebelling: questions

Can H2OME power a home in Malebelling?

Yes, that is what it is designed for. A Malebelling home charges the unit from cheap off-peak power, or from wind or micro-hydro where there is no grid, and runs on stored hydrogen when the power goes. 15 kW continuous covers an average home.

How long can it run Malebelling through a power cut?

Days rather than hours. A battery handles the first moments of an outage, then the fuel cell runs the house on stored hydrogen, which does not lose charge while it waits.

When will H2OME be available in Western Australia?

It is in early development. Pilot installs go to people on the pilot list first, and outer regional Western Australia properties like those around Malebelling are exactly who the pilot is for.

Near Malebelling

All Western Australia locations →

Join the pilot list

Pilot installs go to people on this list first. Rural homes, farms and remote sites especially. No spam, no payment.