Home / Locations / South Australia / Yelta

Off-grid and backup power in Yelta

Yelta 5558, South Australia. Long-outage backup for homes and farms at the end of the line, and a step towards cutting the cord.

Power in Yelta

Yelta is classed as outer regional. Properties out here often sit at the end of long single lines through open country, where one fallen tree can take out a whole road and crews can be hours away.

  • Farms with water pumps and cool rooms
  • Homes at the end of long rural lines
  • Workshops and sheds away from the house
Locality
Yelta, SA 5558
Council area
Yorke Peninsula
Remoteness
Outer regional (ABS)
Nearest centre
122 km from Whyalla

Water in. Power out.

Cheap power splits water into hydrogen. The hydrogen waits in a tank. When the lines go down in Yelta, a fuel cell turns it back into electricity and water, and the water goes round again.

How it works →

Yelta: questions

Can H2OME power a home in Yelta?

Yes, that is what it is designed for. A Yelta home charges the unit from cheap off-peak power, or from wind or micro-hydro where there is no grid, and runs on stored hydrogen when the power goes. 15 kW continuous covers an average home.

How long can it run Yelta through a power cut?

Days rather than hours. A battery handles the first moments of an outage, then the fuel cell runs the house on stored hydrogen, which does not lose charge while it waits.

When will H2OME be available in South Australia?

It is in early development. Pilot installs go to people on the pilot list first, and outer regional South Australia properties like those around Yelta are exactly who the pilot is for.

Near Yelta

All South Australia locations →

Join the pilot list

Pilot installs go to people on this list first. Rural homes, farms and remote sites especially. No spam, no payment.