Home / Locations / Queensland / Atkinsons Dam

Off-grid and backup power in Atkinsons Dam

Atkinsons Dam 4311, Queensland. Power cut backup for grid-connected homes, with days of stored energy instead of hours.

Power in Atkinsons Dam

Atkinsons Dam is classed as inner regional. Most homes here are on the main grid, but storms and faults on rural feeder lines still cut power, and the further a line runs the longer a repair can take.

  • Homes on rural feeder lines
  • Lifestyle blocks with pumps and freezers
  • Small businesses that cannot close for an outage
Locality
Atkinsons Dam, QLD 4311
Council area
Lockyer Valley
Remoteness
Inner regional (ABS)
Nearest centre
39 km from Ipswich

Water in. Power out.

Cheap power splits water into hydrogen. The hydrogen waits in a tank. When the lines go down in Atkinsons Dam, a fuel cell turns it back into electricity and water, and the water goes round again.

How it works →

Atkinsons Dam: questions

Can H2OME power a home in Atkinsons Dam?

Yes, that is what it is designed for. A Atkinsons Dam home charges the unit from cheap off-peak power, or from wind or micro-hydro where there is no grid, and runs on stored hydrogen when the power goes. 15 kW continuous covers an average home.

How long can it run Atkinsons Dam through a power cut?

Days rather than hours. A battery handles the first moments of an outage, then the fuel cell runs the house on stored hydrogen, which does not lose charge while it waits.

When will H2OME be available in Queensland?

It is in early development. Pilot installs go to people on the pilot list first, and inner regional Queensland properties like those around Atkinsons Dam are exactly who the pilot is for.

Near Atkinsons Dam

All Queensland locations →

Join the pilot list

Pilot installs go to people on this list first. Rural homes, farms and remote sites especially. No spam, no payment.