Home / New Zealand guides / Site assessment / Preparing a site survey: Rental home
New Zealand planning guidance for a specific property and load boundary. Ask the owner to arrange the site assessment. H2OME remains in early development.
A useful survey pack includes photographs taken from safe public or user-accessible positions, a property layout, the load inventory and existing service information. Include occupied spaces, vehicle movement, adjacent activities and the proposed access route for qualified assessors.
The survey is an information-gathering step, not a siting decision. Hydrogen containment, ventilation, hazardous-area considerations, electrical integration and approvals require qualified review. Do not mark a spare corner as suitable before those constraints are assessed.
Permanent heating changes and fixed equipment additions require agreement; they are not tenant outage workarounds.
The occupant can document appliance demand, but the owner controls many permanent alterations. A change of tenant can also change the loads and make an old essential-circuit list inaccurate.
Give the assessor the 8-hour base window and the priority list for a rental home, alongside access and ownership information. Those demand figures explain the intended service but do not justify choosing a storage location before the professional survey.
Ask the owner to arrange the site assessment. Permission, responsibilities and any required consents must be resolved before a proposed fixed system is treated as a viable option. Portable preparedness may be more appropriate while that is unresolved.
All numbers below are hypothetical teaching inputs, not measured appliance specifications or product performance. The topic-specific extra load is separate from the base set; omit it if your real inventory already counts it. This worksheet does not include conversion overhead, protection design or a contingency allowance.
For a rental home, assume the selected base loads average 0.15 kW for 8 hours: 0.15 × 8 = 1.2 kWh. Separately, an additional site communications device draws an assumed 12 W for 8 hours: (12 ÷ 1,000) × 8 = 0.096 kWh. The combined illustrative demand is 1.296 kWh.
The worksheet helps explain demand but cannot establish whether any equipment location is suitable.
For arithmetic only, if the complete storage chain had a hypothetical 30% round-trip efficiency, delivering 1.296 kWh would require 1.296 ÷ 0.30 = 4.32 kWh of charging input. This is not a measured H2OME efficiency or recovery result. Ongoing demand during charging would add to the required input.
Base operating window: 8 hours. Extra illustrative load: An additional site communications device, 12 W for 8 hours. Replace every input with a measured or professionally established value.
In New Zealand, discuss supply arrangements and connection questions with your electricity retailer and distributor. Ask the local council about relevant siting, building and water-use requirements. Use appropriately qualified electrical and hydrogen professionals, and refer workplace safety questions to WorkSafe guidance. This page does not establish a consent or compliance outcome.
For medically dependent people in New Zealand, register with your electricity retailer, the company that bills you, and keep that registration current. Re-register when switching retailers; ask the retailer how the distributor is informed and what clinical confirmation is needed. Follow the clinician and equipment provider's contingency plan. Registration does not guarantee uninterrupted electricity, and H2OME is not a substitute for that plan.
H2OME is in early development. Its 10 kW output figure is a design target, not a proven specification. There is no confirmed price, certification, commercial availability or guaranteed runtime in this guide.
Hydrogen is an energy store, not free energy. Grid input, wind and micro-hydro are the charging options considered here. Each requires its own supply assessment. Do not install hydrogen equipment, modify fixed wiring, bypass protection or improvise a connection from this guide.
These official resources provide energy, consumer and technical background. They are not endorsements of H2OME, proof of its performance or a substitute for site-specific professional advice.
The occupant can document appliance demand, but the owner controls many permanent alterations. A change of tenant can also change the loads and make an old essential-circuit list inaccurate. Ask the owner to arrange the site assessment.
No. The 1.296 kWh total is an illustrative demand worksheet, not a runtime result. Actual appliance measurements, usable storage output, starting demand, conversion overhead and reserve limits are needed. The 10 kW design target is not demonstrated output capability.
In New Zealand, discuss supply arrangements and connection questions with your electricity retailer and distributor. Ask the local council about relevant siting, building and water-use requirements. Use appropriately qualified electrical and hydrogen professionals, and refer workplace safety questions to WorkSafe guidance. This page does not establish a consent or compliance outcome. Use the worksheet to brief the relevant professionals, not to install, modify or operate hydrogen equipment.
Ask us about H2OME, tell us about your property or register your interest in the proposed system. We are in early development. No payment or purchase commitment; contacting us does not guarantee a pilot installation.