Home / Australia guides / Outage operations / The first hour without mains power: Compact apartment
Australia planning guidance for a specific property and load boundary. Arrange an owner-approved place for survey visits. H2OME remains in early development.
The first hour is for identifying the interruption, checking people and avoiding unnecessary demand. Confirm whether the problem affects the property or the network through the appropriate supplier channels. Use existing authorised operating instructions; a loss of supply is not a reason to open equipment or improvise wiring.
A calm checklist prevents everybody switching on test appliances while essential loads are settling. Note the time, check the agreed priorities and communicate the current operating limit. If there are alarms, unusual smells or other hazards, follow the emergency plan and keep clear.
Cooking appliances, tumble drying and communal services are outside this illustrative essential load set.
Shared walls, common switchboards and building rules matter as much as the demand inside the flat. A resident does not control the lift, communal pump or fire systems simply because they can list their own appliances.
For a compact apartment, put the check-in task ahead of testing every appliance. Confirm who checks refrigerator, assumed time-averaged input, who establishes network status and whether the extra one-hour charging point is actually needed or already covered by the base communications load.
Arrange an owner-approved place for survey visits. An apartment may be unsuitable for on-site hydrogen equipment. Do not infer suitability from low electricity demand; building permissions, safe separation and professional assessment come first.
All numbers below are hypothetical teaching inputs, not measured appliance specifications or product performance. The topic-specific extra load is separate from the base set; omit it if your real inventory already counts it. This worksheet does not include conversion overhead, protection design or a contingency allowance.
For a compact apartment, assume the selected base loads average 0.13 kW for 6 hours: 0.13 × 6 = 0.78 kWh. Separately, an extra check-in light and charging point draws an assumed 30 W for 1 hours: (30 ÷ 1,000) × 1 = 0.03 kWh. The combined illustrative demand is 0.81 kWh.
Early discretionary demand is small individually but should still have an owner and purpose.
For arithmetic only, if the complete storage chain had a hypothetical 30% round-trip efficiency, delivering 0.81 kWh would require 0.81 ÷ 0.30 = 2.7 kWh of charging input. This is not a measured H2OME efficiency or recovery result. Ongoing demand during charging would add to the required input.
Base operating window: 6 hours. Extra illustrative load: An extra check-in light and charging point, 30 W for 1 hours. Replace every input with a measured or professionally established value.
In Australia, check connection questions with your electricity retailer and distributor. Use electrical professionals holding the licence required in your state or territory, and ask the local council about relevant siting, building and water-use requirements. Energy Made Easy covers New South Wales, Queensland, South Australia, Tasmania and the Australian Capital Territory; outside those jurisdictions, check the relevant state or territory consumer energy comparison resource. Compare your actual tariff and charging window, not an assumed national rate. This guide does not claim to know a particular state's approval process.
For life support equipment in Australia, keep life support registration current with the electricity retailer or distributor as applicable and confirm how the other party is notified. Follow your clinician and equipment provider's contingency plan. Registration is not a guarantee of continuous electricity, and H2OME cannot replace an independent medical contingency.
H2OME is in early development. Its 10 kW output figure is a design target, not a proven specification. There is no confirmed price, certification, commercial availability or guaranteed runtime in this guide.
Hydrogen is an energy store, not free energy. Grid input, wind and micro-hydro are the charging options considered here. Each requires its own supply assessment. Do not install hydrogen equipment, modify fixed wiring, bypass protection or improvise a connection from this guide.
These official resources provide energy, consumer and technical background. They are not endorsements of H2OME, proof of its performance or a substitute for site-specific professional advice.
Shared walls, common switchboards and building rules matter as much as the demand inside the flat. A resident does not control the lift, communal pump or fire systems simply because they can list their own appliances. Arrange an owner-approved place for survey visits.
No. The 0.81 kWh total is an illustrative demand worksheet, not a runtime result. Actual appliance measurements, usable storage output, starting demand, conversion overhead and reserve limits are needed. The 10 kW design target is not demonstrated output capability.
In Australia, check connection questions with your electricity retailer and distributor. Use electrical professionals holding the licence required in your state or territory, and ask the local council about relevant siting, building and water-use requirements. Energy Made Easy covers New South Wales, Queensland, South Australia, Tasmania and the Australian Capital Territory; outside those jurisdictions, check the relevant state or territory consumer energy comparison resource. Compare your actual tariff and charging window, not an assumed national rate. This guide does not claim to know a particular state's approval process. Use the worksheet to brief the relevant professionals, not to install, modify or operate hydrogen equipment.
Ask us about H2OME, tell us about your property or register your interest in the proposed system. We are in early development. No payment or purchase commitment; contacting us does not guarantee a pilot installation.